Inflatable Film Lighting for Production: Setup & Rental Planning | Artemis
Inflatable Film Lighting for Production: Setup & Rental Planning | Artemis
Plan inflatable film lighting by crew, rigging, power, transport, schedule and rental requirements. A production checklist for Artemis balloon lights.
Inflatable Film Lighting for Productions: Setup, Crew & Rental Planning
For producers, rental-house managers and lighting coordinators, a balloon-light booking is a complete production package—not just a fixture. The decision depends on the site, equipment list, crew roles, access arrangements, validated installation plan, project schedule and total cost. This planning guide turns those items into a practical pre-production workflow.
1. Record the Production Site Before Selecting a Fixture
Define the shot area and coverage target (m × m), working height, ceiling obstructions, access to approved mounting/float arrangements, indoor/outdoor conditions, power distribution, cable routes, permissible noise and crew access. Confirm local site permissions and the exact manufacturer-supported fixture configuration. Any proposed suspension or float must receive a model- and venue-specific review.
Site-planning input | Project entry | Selection implication |
Location and scene type | __________ | Studio / stage / exterior / practical location |
Working area and required light level | ____ m × ____ m; ____ lux | Obtain model-specific photometrics; do not size by watts alone |
Clear height and overhead restrictions | ____ m; __________ | Confirm approved positioning/clearance |
Power / phase / circuits | __________ | Confirm ballast/PSU draw, connectors and distribution |
Site weather or hazards | __________ | Obtain wind/exclusion/emergency plan where applicable |
Shoot dates and move frequency | __________ | Choose setup strategy and required standby time |
2. Build a Production-Ready Equipment Package
The equipment request should specify exact Artemis SKU, envelope/fixture, ballast or PSU, controller and DMX/CRMX requirements, inflation equipment when used, approved rigging and secondary protection, cables and distribution, handling case, spares, repair materials and backup light. Supplier catalog examples are not substitutes for a current packing list or engineering plan.
Reference from manufacturer HMI catalog: Sphere2400DL has a Ø3.2 m envelope, 2 × 1200 W HMI sources, 17.2 m³ catalog envelope volume and a 45-minute reference setup time [S1, pp.3–4]. These are catalog characteristics, not a guaranteed on-site setup time, gas order quantity or complete electrical load calculation.
3. Transport and On-Site Crew Responsibility Matrix
Work package | Responsible role | Record / deliverable |
Transport, packing, unloading | Logistics lead / driver | Crate dimensions, weight, access route, arrival slot |
Lighting layout, fixture setting and camera check | Gaffer / lighting lead | Lighting plot, test/acceptance settings |
Overhead support / tether / safety review | Qualified venue rigger / site authority | Approved plan and inspection sign-off |
Electrical distribution, cables, PSU/ballast | Qualified electrician / lighting technician | Circuit list, protected routing, power checks |
Inflation or envelope handling | Trained equipment team | Exact model procedure and gas/air log |
Documentation and handover | Production coordinator | Crew calls, test images, daily equipment log |
4. Installation, Inspection and Strike Workflow
Pre-call and site inspection
Verify access, weather, available circuits, venue restrictions, approved plan, equipment inventory and current manufacturer instructions before crew arrival.
Unload and staging
Photograph the delivered cases, inspect envelope and connectors, confirm the labeled PSU/ballast and arrange protection from sharp surfaces and traffic.
Installation and electrical checks
Have authorized crew carry out the model-approved fill/mount method and independent support checks. Route cables with strain relief and controlled access; inspect safety attachments before energizing.
Lighting acceptance
Log test date, fixture SKU, CCT, dim level, controller profile, camera frame/shutter conditions and meter locations. Record lux readings only when actually measured.
Strike and return
Power down according to manufacturer procedure, allow equipment to cool where required, deflate/pack as instructed, inspect fabric and accessories, and record damages and missing items.
5. Fillable Film-Lighting Budget Worksheet
Use supplier quotes or actual accounting data, not invented savings. Enter a quantity, rate and number of days/hours for each applicable item; choose the correct basis rather than multiplying all items by shoot days.
Budget category | Quantity / basis | Unit price (currency) | Extended total |
Fixture rental or allocated purchase charge | ____ units × ____ days | ________ | ________ |
PSU/ballast, DMX, spares | ____ package / days | ________ | ________ |
Helium/air supply and handling (if applicable) | ____ m³ / cylinders / lot | ________ | ________ |
Rigging design, rated hardware and access | ____ lot / days | ________ | ________ |
Lighting crew and electrician | ____ hours × ____ staff | ________ | ________ |
Venue rigger / inspection | ____ hours / lot | ________ | ________ |
Transport, loading, return | ____ trips / lot | ________ | ________ |
Power distribution / fuel / cable | ____ hours / days / lot | ________ | ________ |
Insurance, damage reserve, backup | ____ lot | ________ | ________ |
TOTAL ESTIMATED COST | ________ |
6. Rent or Buy? Decision Method for Rental Houses
Rent for unpredictable demand, one-off source requirements, or when maintaining the envelope, PSU and approved rigging package is not economical. Consider ownership when the exact configuration is repeatedly booked and the business can support inspections, trained crew, replacement fabric, storage and spares. Compare annual ownership cost and rental package cost at the same expected utilization; do not use a generic ROI claim.
Illustrative decision formulas (method only): annual ownership cost = purchase depreciation/allocation + annual storage + inspections + maintenance + insurance + finance cost, less any appropriately recognized resale value; expected annual hire cost = actual quoted day rate × expected rental days + transport + add-on charges. Break-even days = annual fixed ownership cost / (rental day rate avoided − incremental per-use ownership cost), only when denominator is positive and costs are comparable.
7. Missing Cost Data: What to Request Before Quoting
Missing evidence | Ask for |
Actual equipment price | SKU-specific purchase or rental quotation and validity |
Rigging and setup hours | Local qualified crew quotation plus a site-specific plan |
Helium consumption/cylinders | Manufacturer fill/net lift; local gas supplier usable cylinder volume and delivery quote |
Transportation | Packed weight and dimensions plus collection/return freight rate |
Utilities | Measured or verified PSU/ballast input and local energy charges |
Repairs and lifecycle | Replacement envelope, cleaning, inspection and warranty policy |
8. Production Acceptance Record and Next Steps
At close of installation record exact SKU, site, crew lead, date, approved configuration, inspected mounting/float arrangement, circuits, measured setup/strike times, camera and photometric test conditions, photos and punch list. A brochure image does not establish that a named customer shoot has been performed.
FAQ
How should a producer compare balloon-light quotations?
Compare a matched scope of supply: fixture, controls, cables, gas/rigging, qualified labor, transport, insurance, backup and inspection deliverables.
Is catalog setup time a crew promise?
No. The 30–45 minute times cited for selected HMI models in [S1] are reference figures; actual preparation, inspection and strike depend on the site.
Should a rental house buy rather than rent?
Only after using actual utilization, all-in ownership costs, service capability, local hire rates and downtime risk in a comparable calculation.
Request a Production Package Review
Send BTCOOPS your site plan, working height, schedule, approved installation arrangements, power distribution, intended CCT/coverage and requested rental or purchase scope. We can then align the candidate SKU and logistics list with the project requirements.
Source Notes and Verification Boundary
[S1] Artemis Balloon Lighting — Daylight 5600K, manufacturer cutsheet, pp. 3–4: HMI model dimensions, power, maximum luminous output, envelope volume, indicative setup times and Ellipse4800DL lighting chart.
[S2] Fenigal Lighting Balloon — Film and Television Shooting, 2025 Product Brochure, pp. 5–13: product/application images, LED product family specifications and sphere/ellipse control and PSU options.
[S3] PSU channel explanation, p. 1: example 16-channel effects/GEL priority and RGBA/white control notes; current SKU firmware and values require checking.
Catalog imagery is not proof of a named customer project. Available uploads do not establish actual softbox comparison measurements, independently verified lux, rated suspension loads, site deployment costs or signed on-set records.
Product inquiry: https://www.btcoops.com/ | Manufacturer technical review required for model-specific configuration.
Editable Production Budget Tool
The following worksheet can be copied into a website form, downloadable spreadsheet, or project quotation file. Use actual supplier quotations or internal accounting figures. Do not fill blank costs with invented “savings” or assumed market rates unless clearly labeled as internal planning assumptions.
Budget Category | Quantity / Basis | Unit Price | Extended Total | Notes |
Fixture rental or allocated purchase charge | ____ units × ____ days | ________ | ________ | Enter exact Artemis SKU |
PSU / ballast / DMX / controller / spares | ____ package / days | ________ | ________ | Include backup items if required |
Helium / air supply and handling | ____ m³ / cylinders / lot | ________ | ________ | Only if applicable |
Rigging design, rated hardware and access equipment | ____ lot / days | ________ | ________ | Scissor lift, truss access, etc. |
Lighting crew and electrician | ____ hours × ____ staff | ________ | ________ | Use actual crew scope |
Venue rigger / inspection / sign-off | ____ hours / lot | ________ | ________ | Site-specific requirement |
Transport, loading, unloading and return | ____ trips / lot | ________ | ________ | Vehicle, driver, freight |
Power distribution / generator / cable protection | ____ days / lot | ________ | ________ | Include connectors and cable ramps |
Insurance, damage reserve, backup unit | ____ lot | ________ | ________ | Optional risk allowance |
Accommodation / per diem (if needed) | ____ staff × ____ days | ________ | ________ | Travel projects only |
Tax / VAT / local fees (if applicable) | ____ % or lot | ________ | ________ | According to project location |
TOTAL ESTIMATED PROJECT COST | — | — | ________ | Sum of all applicable lines |
Budget Tool Usage Notes
· Match the budget scope exactly to the proposed package: fixture, controls, cables, gas or rigging, labor, transport, and inspection deliverables.
· Where a balloon can be either helium-filled or air-filled, create one budget version for each method instead of combining both approaches in the same total.
· For internal decision-making, a second column can be added for “Quoted” versus “Actual” to track project performance after the job is completed.
Optional Rent-vs-Buy Companion Fields
If the worksheet is converted into Excel or a web calculator, add optional decision fields for annual utilization days, annual ownership cost, comparable rental day rate, incremental service cost per use, and break-even days. Keep these figures separate from the project-execution budget above so the reader does not confuse ownership analysis with a single-shoot quotation.
Website calculator specification (for marketing implementation)
Use each line’s quantity and rate to calculate line total; distinguish daily rates, hourly rates and fixed-lot charges. Sum only applicable line totals; apply taxes separately according to local rules. Exclude refundable security deposits from expense totals while tracking them as cash-outlay requirements. Display currency and quote date.
Buyer-facing usage text: “Enter your selected fixture, number of days, labor rates, transport, gas or rigging costs, power distribution and insurance to estimate your production package. The result is a budget estimate, not a supplier quotation or safety approval.”
Send Your Custom Product Requirement
Tell us the product family, intended application, size, quantity, operating conditions and delivery target. Your inquiry email will automatically include the page you are viewing so our team can understand the exact product, technology or reference that led to your request.
- Product family or model of interest
- Required size, quantity and customization
- Application, installation and operating environment
- Project country, operating conditions and delivery target